IHEP OpenIR

Browse/Search Results:  1-10 of 14 Help

Selected(0)Clear Items/Page:    Sort:
bERLinPro Becomes SEALab: Status and Perspective of the Energy Recovery Linac at HZB 会议论文
Proceedings of the 13th International Particle Accelerator Conference, Thailand, 2022
Authors:  A. Neumann, B. Alberdi-Esuain;  T. Birke;  P. Echevarria;  D. Eichel;  F. Falkenstern;  R. Fleischhauer;  A. Frahm;  F. Göbel;  A. Heugel;  F. Hoffmann;  H. Huck;  T. Kamps;  S. Klauke;  G. Klemz;  J. Kolbe;  J. Kühn;  B.C. Kuske;  J. Kuszynski;  S. Mistry;  N. Ohm;  H. Ploetz;  S. Rotterdam;  O. Schappeit;  G. Schindhelm;  C. Schröder;  M. Schuster;  H. Stein;  E. Suljoti;  Y. Tamashevich;  M. Tannert;  J. Ullrich;  A. Ushakov;  J. Völker;  C. Wang
Adobe PDF(3339Kb)  |  Favorite  |  View/Download:11/0  |  Submit date:2023/01/05
Status of BlueSky Deployment at BESSY II for Machine Commissioning 会议论文
Proceedings of the 18th International Conference on Accelerator and Large Experimental Physics Control Systems, China, 2021
Authors:  P. Schnizer;  J. Bengtsson;  T. Birke;  J. Li;  T. Mertens;  M. Ries
Adobe PDF(285Kb)  |  Favorite  |  View/Download:15/0  |  Submit date:2022/04/11
Status of BlueSky Deployment at BESSY II for Machine Commissioning 会议论文
Proceedings of the 18th International Conference on Accelerator and Large Experimental Physics Control Systems, China, 2021
Authors:  P. Schnizer;  J. Bengtsson;  T. Birke;  J. Li;  T. Mertens;  M. Ries
Adobe PDF(285Kb)  |  Favorite  |  View/Download:12/0  |  Submit date:2023/01/04
Machine Learning Tools Improve BESSY II Operation 会议论文
Proceedings of the 18th International Conference on Accelerator and Large Experimental Physics Control Systems, China, 2021
Authors:  L. Vera Ramiréz;  T. Birke;  G. Hartmann;  R. Müller;  M. Ries;  A. Schälicke;  P. Schnizer
Adobe PDF(1454Kb)  |  Favorite  |  View/Download:22/0  |  Submit date:2022/04/11
Online Model Developments for BESSY II and MLS 会议论文
Proceedings of the 12th International Particle Accelerator Conference, Brazil, 2021
Authors:  P. Schnizer;  J. Bengtsson;  T. Birke;  J. Li;  T. Mertens;  M. Ries;  A. Schälicke;  L. Vera Ramirez
Adobe PDF(1141Kb)  |  Favorite  |  View/Download:13/0  |  Submit date:2022/01/18
Machine Learning Tools Improve BESSY II Operation 会议论文
Proceedings of the 18th International Conference on Accelerator and Large Experimental Physics Control Systems, China, 2021
Authors:  L. Vera Ramiréz;  T. Birke;  G. Hartmann;  R. Müller;  M. Ries;  A. Schälicke;  P. Schnizer
Adobe PDF(1454Kb)  |  Favorite  |  View/Download:2/0  |  Submit date:2023/01/04
Status of the Control System for the Energy Recovery Linac BERLinPro at HZB 会议论文
Proceedings of the 63rd ICFA Advanced Beam Dynamics Workshop on Energy Recovery Linacs, Berlin
Authors:  T. Birke;  P. Echevarria;  D. Eichel;  R. Fleischhauer;  J.G. Hwang;  G. Klemz;  R. Müller;  C. Schröder;  E. Suljoti;  A. Ushakov
Adobe PDF(1376Kb)  |  Favorite  |  View/Download:44/1  INSPIRE cited times:[1]  |  Submit date:2021/05/25
EPICS Archiver Appliance - Installation and Use at BESSY/HZB 会议论文
Proceedings of the 17th International Conference on Accelerator and Large Experimental Physics Control Systems, New York, 2019
Authors:  T. Birke
Adobe PDF(1414Kb)  |  Favorite  |  View/Download:28/0  INSPIRE cited times:[0]  |  Submit date:2021/05/28
Status of the Control System for the Energy Recovery Linac BERLinPro at HZB 会议论文
Proceedings of the 17th International Conference on Accelerator and Large Experimental Physics Control Systems, New York, 2019
Authors:  T. Birke;  P. Echevarria;  D. Eichel;  R. Fleischhauer;  J.G. Hwang;  G. Klemz;  R. Müller;  C. Schröder;  E. Suljoti;  A. Ushakov
Adobe PDF(2371Kb)  |  Favorite  |  View/Download:44/0  INSPIRE cited times:[1]  |  Submit date:2021/05/28
A TUNE FEED FORWARD SYSTEM FOR THE BESSY II STORAGE RING 会议论文
Proceedings of the 9th International Conference on Accelerator & Large Experimental Physics Control Systems, Korea, 2003
Authors:  T. Birke;  J. Feikes;  B. Franksen;  R. Lange;  I. M¨uller;  G. Pfeiffer;  J. Rahn
Adobe PDF(179Kb)  |  Favorite  |  View/Download:74/0  |  Submit date:2016/09/07