IHEP OpenIR

Browse/Search Results:  1-3 of 3 Help

Selected(0)Clear Items/Page:    Sort:
Installation and Commissioning of the Exactly-Constrained X-Ray Mirror Systems for Sirius/LNLS 会议论文
Proceedings of the 11th International Conference on Mechanical Engineering Design of Synchrotron Radiation Equipment and Instrumentation, Chicago, 2021
Authors:  V.B. Zilli;  C.S.N.C. Bueno;  G.V. Claudiano;  R.R. Geraldes;  G.N. Kontogiorgos;  F.R. Lena;  S.A.L. Luiz;  G.B.Z.L. Moreno;  A.C. Pinto;  G.L.M.P. Rodrigues;  M.S. Souza;  L.M. Volpe
Adobe PDF(1351Kb)  |  Favorite  |  View/Download:27/0  |  Submit date:2022/04/12
Design and Commissioning of the TARUMÃ Station at the CARNAÚBA Beamline at Sirius/LNLS 会议论文
Proceedings of the 11th International Conference on Mechanical Engineering Design of Synchrotron Radiation Equipment and Instrumentation, Chicago, 2021
Authors:  R.R. Geraldes;  C.S.N.C. Bueno;  L.G. Capovilla;  D. Galante;  L.C. Guedes;  L.M. Kofukuda;  G.N. Kontogiorgos;  F.R. Lena;  S.A.L. Luiz;  G.B.Z.L. Moreno;  I.T. Neckel;  C.A. Perez;  A.C. Piccino Neto;  A.C. Pinto;  C. Sato;  A.P.S. Sotero;  V.C. Teixeira;  H.C.N. Tolentino;  W.H. Wilendorf;  J.L. da Silva
Adobe PDF(1472Kb)  |  Favorite  |  View/Download:37/0  |  Submit date:2022/04/12
Optimization Method Using Thermal and Mechanical Simulations for Sirius High-Stability Mirrors 会议论文
Proceedings of the 10th Mechanical Engineering Design of Synchrotron Radiation Equipment and Instrumentation, Paris, 2018
Authors:  L.M. Volpe;  G.V. Claudiano;  R.R. Geraldes;  S.A.L. Luiz;  A.C. Pinto
Adobe PDF(737Kb)  |  Favorite  |  View/Download:165/6  |  Submit date:2019/03/13