Knowledge Management System Of Institute of High Energy
Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain | |
F. Roncarolo; S. Bart Pedersen; J.M. Belleman; D. Belohrad; M. Bozzolan; C. Bracco; S. Di Carlo; J. Emery; A. Goldblatt; A. Guerrero; S. Levasseur; A. Navarro Fernandez; E. Renner; H.S. Sandberg; J.W. Storey; J. Tan; J. Tassan-Viol | |
2021 | |
Source Publication | Proceedings of the 12th International Particle Accelerator Conference |
Conference Date | 2021 |
Conference Place | Brazil |
Document Type | 会议论文 |
Identifier | http://ir.ihep.ac.cn/handle/311005/290338 |
Collection | 学术会议_国际参会_JaCoW高能所参会会议_IPAC |
Affiliation | CERN, Geneva, Switzerland |
Recommended Citation GB/T 7714 | F. Roncarolo,S. Bart Pedersen,J.M. Belleman,et al. Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain[C],2021. |
Files in This Item: | ||||||
File Name/Size | DocType | Version | Access | License |
Items in the repository are protected by copyright, with all rights reserved, unless otherwise indicated.
Edit Comment