Knowledge Management System Of Institute of High Energy
Commissioning of Beam Instrumentation at the CERN AWAKE Facility After Integration of the Electron Beam Line | |
I. Gorgisyan; C. Bracco; S. Burger; S. Döbert; S.J. Gessner; E. Gschwendtner; L.K. Jensen; S. Jensen; S. Mazzoni; D. Medina; K. Pepitone; L. Søby; F.M. Velotti; M. Wendt | |
Source Publication | 9th International Particle Accelerator Conference |
Conference Date | 2018 |
Conference Place | Vancouver, BC, Canada |
inspireid | 1690589 |
ADS Bibcode | 2018JPhCS1067g2015G |
Citation statistics |
Cited Times:0 [INSPIRE]
Cited Times:0 [ADS]
|
Document Type | 会议论文 |
Identifier | http://ir.ihep.ac.cn/handle/311005/267722 |
Collection | 学术会议_国际参会_JaCoW高能所参会会议_IPAC |
Affiliation | CERN, Geneva, Switzerland |
Recommended Citation GB/T 7714 | I. Gorgisyan,C. Bracco,S. Burger,et al. Commissioning of Beam Instrumentation at the CERN AWAKE Facility After Integration of the Electron Beam Line[C]. |
Files in This Item: | ||||||
File Name/Size | DocType | Version | Access | License |
Items in the repository are protected by copyright, with all rights reserved, unless otherwise indicated.
Edit Comment