IHEP OpenIR  > 加速器中心
Beam dynamics studies on BEPCII storage rings at the commissioning stage
Qin Q(秦庆); Huang N(黄楠); Liu WB(刘渭滨); Liu YD(刘瑜冬); Peng YM(彭月梅); Qiu J(邱静); Wang D(王逗); Wang XH(王昕昊); 王娜(加); Wang JQ(王九庆); Wei YY(魏源源); Wen XM(温雪梅); Xing J(邢军); Xu G(徐刚); Yu CH(于程辉); Zhang C(张闯); Zhang Y(张源); Zhao Z(赵政); Zhou DM(周德民)
2009
发表期刊中国物理C
期号S2页码:65-70
通讯作者秦庆
摘要During the 1st and 2nd stages of the commissioning of the upgrade project of the Beijing Electron Positron Collider (BEPCⅡ), which started on Nov. 12, 2006 and Oct. 24, 2007, respectively, we got the luminosity one tenth of its design value, provided beams to synchrotron radiation users for about 4 ...
关键词BEPCⅡ commissioning beam dynamics luminosity
文献类型期刊论文
条目标识符http://ir.ihep.ac.cn/handle/311005/217026
专题加速器中心
推荐引用方式
GB/T 7714
Qin Q,Huang N,Liu WB,et al. Beam dynamics studies on BEPCII storage rings at the commissioning stage[J]. 中国物理C,2009(S2):65-70.
APA 秦庆.,黄楠.,刘渭滨.,刘瑜冬.,彭月梅.,...&周德民.(2009).Beam dynamics studies on BEPCII storage rings at the commissioning stage.中国物理C(S2),65-70.
MLA 秦庆,et al."Beam dynamics studies on BEPCII storage rings at the commissioning stage".中国物理C .S2(2009):65-70.
条目包含的文件
文件名称/大小 文献类型 版本类型 开放类型 使用许可
7127.pdf(840KB)期刊论文作者接受稿限制开放CC BY-NC-SA请求全文
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[秦庆]的文章
[黄楠]的文章
[刘渭滨]的文章
百度学术
百度学术中相似的文章
[秦庆]的文章
[黄楠]的文章
[刘渭滨]的文章
必应学术
必应学术中相似的文章
[秦庆]的文章
[黄楠]的文章
[刘渭滨]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。